The Turbine Mixer was Fabricated at the Mechanical Engineering Workshop of Institute of Management and Technology, Enugu.
The method of the fabrication of the turbine mixer involved a preliminary computation of the dimensions of the standard turbine in relation to the dimension of the reacting vessel in which they will be used in, making out, cutting out to sizes, rolling folding, welding, body – filling, filling, glass – papering and painting. The total surface area is 10741.5CM2
The first step taken in the fabrication of ht said project was the selection of the material suitable for the construction.
The materials used in the construction were locally sourced and were selected to suit the desired purpose. The mild steel was used instead of galvanized steel due to its relative low cost.
The mild steel was located with paint to prevent corrosion attack and deterioration of the work.
The dimensions of the project were as follow 31.0CM. for the height and –21.0cm for the diameter. The volume [capacity] of the cylinder is 10,74 1.5cm3 the average speed of the turbine mixer is 125pm. The turbine mixer is manually operated a design that is meant to save cost.
NOTE: Preview the following Table of Content before you download the full content. WYSIWYG – What You See Is What You Get.
Title page
Letter of transmittal
Approval page
Dedication
Acknowledgement
Abstract
Table of content
CHAPTER ONE
1.0 Introduction
1.1 Objectives / scope of the project
CHAPTER TWO
2.0 Literature review
2.1 Agitation and mixing
2.2 Liquid – liquid agitation
2.3 Purpose of agitation
2.4 Types of mixer / mixing equipment
2.5 Application of impeller
2.6 Shaft
2.7 Baffles
2.8 Circulation rates
2.9 Mixers for plastic solids and pastes
2.10 Mixers for dry light solids [powder]
2.11 Material of construction.
CHAPTER THREE
3.0 Fabrication / modification procedure
3.1 Steps of fabrication process
3.2 Cost analysis.
CHAPTER FOUR
4.0 Discussion
4.1 Conclusion
4.2 Recommendation
4.3 Reference
4.4 Nomenclature
CHAPTER FIVE
DISCUSSION
CONCLUSSION
RECOMMENDATION
REFERENCES
APPENDIX / NOMENECLATURE
This “Construction Of Turbine Mixer” file contains 5 Chapters, 44 Pages and 5,534 Words.
The author of Construction Of Turbine Mixer is written at the front page of the downloaded file.
To download this Construction Of Turbine Mixer full file, click on “Download File” on top of this page and follow the next.